Floors Installed at The Hayes

Floors Installed at The Hayes

Now that the hardwood floors have had time to acclimate to their environment, it is time to begin laying the pieces down. Our top units, including the penthouse will feature 4-inch red oak, stained with an Ebony, Jacobean,  Dark Walnut blend. The terrace-level units...
The Hayes Drywall

The Hayes Drywall

Two stilted workers are completing the drywall at 1201 Kenyon St NW. After the initial installation we will go back and perform a quality control inspection to ensure there are no waves in the drywall.  Meanwhile, the hardwood floors are currently acclimating to the...
Insulation Installation

Insulation Installation

Looking up from the third floor of the penthouse unit, onto the landing of the rooftop deck, you’ll see that the insulation has been installed at 1201 Kenyon St NW. We chose spray foam insulation because it not only cancels out the noise from your neighbors, but...
Final Finials

Final Finials

As the possibility of snow falls on DC, the new finials at The Hayes go up. The new finials were formed using the same design and materials as the originals to replicate the time period in which the home was first built. We chose to recreate these pieces using the...
Iron Work

Iron Work

The iron work has been added to the back façade of The Hayes. There will be a balcony off of every unit, so that you can enjoy these rare, warm DC days. Against the brick exterior this ironwork adds and industrial feel to the property and really adds aesthetic appeal...
Rooftop Sunrise

Rooftop Sunrise

Waking up on a Monday morning can be a rough task, but if this was the view you were able to wake up to, we think it would be a little less daunting. Our latest project, The Hayes, has 360 degree views from its rooftop deck. While the lower two units have access to a...