The Sidney:  Let’s Take Things Outside

The Sidney: Let’s Take Things Outside

The outdoor spaces at The Sidney. Unit 5’s private roof deck is looking great and the private front balconies of units two through five will be complete this week. For more information, visit www.TheSidneyDC.com, or contact Edward Slavis of S&G...
The Plymouth:  Shower Tile

The Plymouth: Shower Tile

It’s shower time at The Plymouth, our five-unit luxury condo on the H Street. The stacked white subway tile and black mini octagonal shower floor tile gives the space a balanced, simple, sleek, and modern feel. For more information, visit www.ThePlymouthDC.com,...
The Sidney:  Let’s Take Things Outside

The Sidney: A Focus on the Exterior

While we install finishes at The Sidney, we are also completing its beautiful exterior. We have installed siding around its floor-to-ceiling south facing windows and completed the concrete staircase that will serve as the building’s main entrance. Only a few weeks to...
The Barlow:  Nearing the Finish Line

The Barlow: Nearing the Finish Line

The finish line at The Barlow is in site! Now that tile, flooring, and cabinets have been installed we’ll move on to the finishes, countertops, and interior paint. Also, who doesn’t love some natural light in the shower? Never fear: the window is...
The Linnea:  So Much Progress

The Linnea: So Much Progress

The basement slab is poured. The roof is installed. Duct work and plumbing rough-in are under way. Framing is near completion. We’ve hit quite a productive groove at The Linnea, our 11th Street Corridor, 11-unit condo! Excited to see what we’re working...